The existing building
Structure, drainage, floor levels, hidden conditions and access to the work area.
Budget with the whole scope in mind
Online figures can help start a conversation. A real quote needs the property, the person and the proposed work to be understood first.
These are broad allowances retained from the supplied website, not a current independent market survey. They do not establish availability, an offer, GST treatment or funding entitlement. Ask for a current itemised quote and confirm all inclusions.
| Project type | Broad allowance | What to check |
|---|---|---|
| Focused rails and support changes | From several hundred dollars | Product, wall support and installation scope |
| Thresholds and small access changes | $1,000 to $8,000 | The transition, door operation and surrounding work |
| Door widening and internal access | $4,000 to $15,000 | Wall structure, services and reinstatement |
| Permanent ramps and landings | $8,000 to $30,000 or more | Rise, route, landings, material and associated work |
| Walk in shower conversion | $15,000 to $35,000 or more | Floor, drainage, waterproofing and surrounding finishes |
| Complete accessible bathroom | $25,000 to $60,000 or more | Layout, structure, fixtures and access requirements |
| Whole home modifications | $40,000 to $100,000 or more | Rooms involved, access routes and construction complexity |
| Lifts and complex structural access | Assessment required | Equipment, building work and ongoing service needs |
Structure, drainage, floor levels, hidden conditions and access to the work area.
Room layout, equipment, support, fixture choices and any professional recommendations.
Design, approvals, temporary facilities, reinstatement and the construction sequence.
Price depends on the work behind the finished result: structure, drainage, access, professional input and the way the home will be used during construction. Compare a confirmed scope, not just a headline price.
Read the guideThe main cost drivers are the existing bathroom, the layout you need and the building work required to connect the two. Removing a step may involve much more than replacing a shower screen.
Read the guideGive each contractor the same current brief, then compare what is included, excluded and still uncertain. The lowest total is not meaningful when it describes different work.
Read the guideYour next chapter starts here
A bathroom, the front steps or a bigger plan. Start with what is difficult and we can discuss the next step.
This is a project enquiry, not an OT assessment or a funding application. Please do not include medical records or sensitive personal details.